ブラックフライデーセールをチェック! 送料無料、素晴らしいギフト、割引など!あとで終了

Education · Education

“3Dプリンティングのない世界は想像できません。機能しないでしょう!”

JBJonathan BenhamuFounder of HYTAC and lecturer at ETH Zurich
ETH Zurich
Read the story4 chapters

ETH Zurich case study in numbers

ETH Zurichは、科学技術分野における世界有数の大学の一つです。その建築学科では、Hybrid Timed Architecture (HYTAC) プログラムが100台以上のOriginal Prusa 3Dプリンターを稼働させ、建築デザインを現実のものにしています。

  • 1855year founded
  • 25,000total students enrolled
  • 100+Original Prusa 3D printers
300+students trained per term

During their first week, over 300 architecture students are divided into groups to learn CAD, slicing, and 3D printing.

2 daysto assemble a printer

Students must build the machine before they use it. Using the Original Prusa kit, assembly must be completed in 2 days.

20printers replaced each year

To keep the lab up to date, HYTAC sells 20 older printers to students at a reduced price every year and replaces them with new ones.

From the first week to a grand exhibition

  1. 問題300人以上の建築学生の多くにとって、これは急速な没入です。彼らは日々のワークフローに役立つよう、設計、スライス、プリントの方法を迅速に習得する必要があります。
  2. 解決策Through hands on learning via the "3D Jony" platform and classroom exercises, the HYTAC program gets students up to speed immediately, dividing tasks between CAD drawing, model preparation, and machine assembly.
  3. 価値By the end of the week, the students are successfully printing their own models, and everything culminates in a large exhibition showcasing their new skills.

    “I saw all these models, which I found really interesting, and I wondered how they were made in just one week. And that was thanks to 3D printing.”

    Jonas Jost, first year architecture student
Jonathan Benhamu leaning over an Original Prusa printer beside a student, printed model pieces on the table

Building the machines they learn on

  1. 問題Integrating 3D printing into an architectural curriculum requires students to deeply understand the tools they use rather than treating them as a black box.
  2. 解決策学生は最初の1週間で機械に触れます。300人以上の建築学生がグループに分かれ、Original Prusa 3Dプリンターキットの組み立てを任されます。これは2日以内に完了する必要があります。
  3. 価値Through assembly, design, and slicing, the students bridge the gap between theoretical research and practical applications.

    “In the end, every 3D printer we have, has been built by our students so it has the added value of them knowing how it works and being able to fix it themselves.”

    Jonathan Benhamu, lecturer at ETH Zurich
A student screwing together a stepper motor at a studio table, with printer frame parts beside her

A neighbourhood of Barcelona, printed at model scale

  1. ProblemStudents need to master key architectural principles: modeling in CAD software, analyzing context, scaling, detailing, and organizing a massive cooperative workflow.
  2. Solution学生たちは、トーレ・アグバールとボガテルビーチを特徴とするバルセロナの人気エリアであるエル・ポブレノウをモデル化しました。彼らはArchiCADを使用して2D分析を大規模な3Dモデルに変換し、数週間かけて印刷しました。Printed onOriginal Prusa MK4S
  3. Value印象的な最終モデルはショールーム全体を埋め尽くしています。
A very large white printed city model filling a room, with a crowd of students standing around it

A lab on the roof built for 100 printers

  1. ProblemOperating a fleet of over 100 3D printers safely in a university environment requires strict measures for fire safety, ventilation, and air filtration.
  2. SolutionSet up in collaboration with Professor Andrea Deplazes, the 3D lab is located inside a specially developed high tech container on the roof of the architecture department. All 3D printers are housed in a temperature controlled and well ventilated room, safely stored behind glass doors.
  3. Value3Dプリンティングラボを常に最新の状態に保つため、HYTACは毎年20台のプリンターを学生に割引価格で販売し、20台の新品と交換しています。
A narrow lab corridor lined floor to ceiling with printers behind glass doors and white filament spools

Still not sure where 3D printing fits your production?

See what other organizations print: an architecture studio, a collider, a hangar, a car plant, a trauma center.

Browse all stories by industry or application
MASSLAB prints master plans clients can rearrange

Customer story MASSLAB

MASSLAB prints master plans clients can rearrange

The 40 person Porto architecture studio has printed nearly all of its models since 2021. Buildings, parks and terrain come out as separate swappable pieces, so a roofline changes during the meeting instead of after it.

  • 40people in Porto
  • 2021nearly all model making printed since
  • 2dual head Original Prusa XL printers
“MASSLAB models buildings, parks and terrain as individually swappable printed pieces, so a master plan can be rebuilt on the table instead of remade.”
CCCatarina Calçada GasparArchitect and Communication Manager
MASSLAB logo
CERN prints parts that go straight into the LHC tunnel

Customer story CERN

CERN prints parts that go straight into the LHC tunnel

The European Organization for Nuclear Research runs Original Prusa printers across its departments, from maintenance and IT to the research facilities. What comes off them is not always a model of the part: a printed bead carries a fragile measuring wire for 200 metres inside the Large Hadron Collider.

  • 12,000+people at CERN
  • 27 kmthe LHC ring
  • 100 munderground
“3D printing allows scientists and engineers to quickly create prototypes and push the boundaries of what’s possible.”
JKJonas KamppMechatronics engineer at CERN
Škoda Auto replaced the metal clamps that were eating its cogwheels

Customer story Škoda Auto

Škoda Auto replaced the metal clamps that were eating its cogwheels

A printer farm went into the welding plant in Mladá Boleslav after maintenance staff, who already print at home, brought the idea to their supervisors. 3D-printed clamps fully replaced the metal ones, and Central Technical Service basically stopped buying spare parts and started printing them instead.

  • 1,065,000cars built for customers in 2025
  • 35,000employees
  • 13,000+car deliveries saved from delay
“Cooperation of Škoda Auto and Prusa Research changed our way of thinking about production.”
JPJana Polášek FilováExpert Coordinator for Digitisation and Innovation in Production and Logistics, Škoda Auto
Škoda Auto logo
University Hospital Brno printed the models a custom talus was measured on

Customer story University Hospital Brno

University Hospital Brno printed the models a custom talus was measured on

The Trauma Surgery Department rebuilt a crushed ankle around a custom titanium talus. What came off the hospital’s own Prusa printers was the mould for the antibiotic cement spacer and the plastic models the implant was sized on in the dissection room.

  • 4months from accident to implant
  • 30+days of preparation
  • 1printed spacer mould
“Using 3D-printed models in the dissection room allowed us to test the mechanical properties of the implant and perform a complete dry run.”
APAssoc. Prof. Milan Krtička, MD, PhD.Head of the Trauma Surgery Department, University Hospital Brno
University Hospital Brno logo
1 / 4

Your team’s questions, answered

What educators and technical staff usually ask when scaling up.

Curriculum & Training

Student onboarding

In their first week, over 300 students are divided into groups and tasked with assembling an Original Prusa kit (which takes two days), preparing 3D models, or designing in CAD.

The ETH Zurich architecture lab primarily relies on PLA and PETG for proof of concept and functional architectural models.

Lab Setup & Safety

Facility requirements

The printers are housed in a specially developed high tech container on the architecture building's roof. They are safely stored behind glass doors in a temperature controlled and well ventilated room with strict fire safety and air filtration measures.

Fleet Management

Upkeep and lifecycle

To ensure the lab remains cutting edge, HYTAC sells 20 of its older printers to the students at a reduced price every year and replaces them with 20 brand new machines.